QUAKE AI · GTC BERLIN

DRAFT · SCENE 02 · WHY: ESTABLISH HUMAN POSSIBILITY

MORE ACCESS.
MORE FREEDOM
TO BUILD.

02 / WHY

Vimeo loads only with website privacy consent.
Map of North America and Europe drawn as purple stripes, with ten Quake AI locations. Available: Boden, Sweden; Notodden, Norway; Pittsburgh, United States. Contracted: Atlanta, United States. Six further locations in the United Kingdom, the Netherlands, Portugal and Norway are marked with the Quake icon.Boden, SwedenPittsburgh, United StatesAtlanta, United StatesNotodden, Norway

Global data center footprint

01 Overview · Footprint

Global Data Center Footprint

  • AvailablePittsburgh, USA5 MW
  • ContractedAtlanta, USA180 MW
  • AvailableBoden, Sweden49 MW
  • AvailableNotodden, Norway20 MW

OperationalChester · London · Sines · Lefdal · Kristiansand · Amsterdam

AvailableOperationalContracted

01 Overview · Footprint table

Global Data Center Footprint

LocationRegionUtility (MW)RFSStatus
Pittsburgh, USAUSA56-9 months*Available
Atlanta, USAUSA18012 months*Contracted
Boden, SwedenEurope499-12 months*Available
Notodden, NorwayEurope2012 months*Available

*from contract signature

01 Overview · GPU capacity

GPU Prospective Summary — USA

SiteCritical IT (MW)#VR200 GPUs#GB300 GPUs#B300 GPUs
Atlanta, USA180 MW Utility14442,33651,84055,296
Pittsburgh, USA5 MW Utility~2.55~1,008~1,152~1,152

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

01 Overview · GPU capacity

GPU Prospective Summary — Europe

SiteCritical IT (MW)#VR200 GPUs#GB300 GPUs#B300 GPUs
Boden, SwedenP1: 22.6 MW · P2: 49 MW Utility40.1212,09613,82416,128
Notodden, Norway20 MW Utility165,0405,7606,912

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

01 Overview · Booth moment

BOOTH 3038

Next raffle or booth action

Berlin time or countdown · how to take part · terms URL

DRAFT · CONTENT TO BE CONFIRMED (STORYBOARD OPEN QUESTION 4)

02 Atlanta (ATL1) · Chapter opener

ATL1

Atlanta

USA

215 Industrial Drive, Maysville, Georgia USA

DRAFT · SITE FOOTAGE: VIMEO 10 S CUT TO FOLLOW (STORYBOARD OPEN QUESTION 3)

02 Atlanta (ATL1) · Technical specifications

215 INDUSTRIAL DRIVE, MAYSVILLE, GEORGIA USA

Technical Specifications

  • 180 MW

    Utility Capacity

  • 150+ acre

    Campus

  • 12 months

    RFS from contract signature

Utility Capacity
Total 180 MW – 3x 60 MW phases
IT Power (PUE 1.20)
144 MW (48 MW per phase)
Number of NVL72 Racks
588 (196 per phase)
Backup Power
Diesel Generators (N+1)
Rack Power – Max Q EDP
198kW
Total GPU Count
42,336 (14,112 per phase) - Vera Rubin
Cooling Method
RDHx (Air) + DLC (Liquid)

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

02 Atlanta (ATL1) · GPU potential

215 INDUSTRIAL DRIVE, MAYSVILLE, GEORGIA USA

GPU Potential

Supports up to

42,336

VR GPUs

PhaseCritical IT (MW)#VR200 GPUs#GB300 GPUs#B300 GPUs
Phase 14814,11217,28018,432
Phase 24814,11217,28018,432
Phase 34814,11217,28018,432
Total14442,33651,84055,296
  • 180 MW Utility Capacity
  • 144 MW critical IT across 3 phases
  • Scalable Campus in Atlanta metro

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

02 Atlanta (ATL1) · Execution timeline

215 INDUSTRIAL DRIVE, MAYSVILLE, GEORGIA USA

Maysville execution strategy prioritizes rapid RFS

12 MONTHS END-TO-END FOR FIRST 60 MW

  • 5 MonthsOffsite module manufacturing
  • 10 MonthsFit-Out Ready Delivery
  • Parallel WorkstreamsOn and off-site to compress timeline
1
2
3
4
5
6
7
8
9
10
11
12
Offsite MFGModular DC Fab.
5 mo
EarthworkGrading & Prep
3 mo
MC UtilityMed. Voltage Infra.
2 mo
On Site FabricationModule Assembly
3 mo
E/M Comm.Elec. & Mech. Comm.
3 mo
Fit-OutFinal & Handover
2 mo
▼ Modules Arrive▼ Fit-Out Ready

02 Atlanta (ATL1) · Phases and lead times

215 INDUSTRIAL DRIVE, MAYSVILLE, GEORGIA USA

3 Phases, Parallel Build-out

“Modular offsite manufacturing combined with streamlined on-site parallel workstreams allow for compressed build schedules.”

Project Timelines

  • Phase 1Build-OutFit-Out60 MW
  • Phase 2Build-OutFit-Out60 MW
  • Phase 3Build-OutFit-Out60 MW

Lead Time Overview · Long Leadtime Items (Average Leadtime)

  • Up to 12 monthsMV Switchgear, Circuit Breakers, MV/LV Transformers, Generators
  • 9 monthsMW Relays, Cooling plant – External, UPS
  • 6 – 9 monthsCooling – Internal, LV Switchgear, Busduct

02 Atlanta (ATL1) · Location

215 INDUSTRIAL DRIVE, MAYSVILLE, GEORGIA USA

Location & Connectivity

Address
215 Industrial Drive,
Maysville, GA 30558
Coordinates
34.2546, -83.5641
Interstate I-85
~2 mi · ~4 min
Airport
78 mi · ~1 h 25 min drive (ATL)

02 Atlanta (ATL1) · Follow us

Follow
Quake AI

DRAFT · CHANNEL AND URL TO BE CONFIRMED (STORYBOARD OPEN QUESTION 6)

03 Pittsburgh (PIT1) · Chapter opener

PIT1

Pittsburgh

USA

615 McMichael Road, McKees Rocks, Pennsylvania

DRAFT · SITE FOOTAGE: VIMEO 10 S CUT TO FOLLOW (STORYBOARD OPEN QUESTION 3)

03 Pittsburgh (PIT1) · Technical specifications

615 MCMICHAEL ROAD, MCKEES ROCKS, PENNSYLVANIA

Technical Specifications

  • 5 MW

    Utility Capacity

  • 5,686 sq ft

    Data Hall 1

  • ~2.55 MW

    Critical IT power in Data Hall 1

Utility Capacity
5 MW
Cooling
DLC & RDHx (Cooling Tower & Chillers)
UPS
Static UPS (N+1)
Backup Power
Diesel Generators (N+1)
Connectivity
Carrier Neutral – 2 meet-me-rooms
Security
Perimeter fencing, access control throughout, 24/7 security
Concurrently Maintainable
Tier III aligned – N+1 power & cooling

03 Pittsburgh (PIT1) · GPU potential

615 MCMICHAEL ROAD, MCKEES ROCKS, PENNSYLVANIA

GPU Potential

Supports up to

1,008

VR GPUs

PhaseCritical IT (MW)#VR200 GPUs#GB300 GPUs#B300 GPUs
Phase 1~2.55~1,008~1,152~1,152
Total~2.55~1,008~1,152~1,152
  • 5 MW utility capacity
  • 2.55 MW critical IT

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

03 Pittsburgh (PIT1) · Execution plan

615 MCMICHAEL ROAD, MCKEES ROCKS, PENNSYLVANIA

Execution Plan

6-9 months RFS

Time to upgrade existing data hall for GB/VR liquid cooled deployments with RDHx & DLC.

  • Up to 1K GB or VR GPUsAnticipated GPU count following updated data center design package.
  • Future ExpansionThe site benefits from additional internal space allocated for expansion capacity and power pathway with utility provider.
  • 5 MW

    Utility Capacity

  • 5,686 sq ft

    Data Hall 1

  • ~2.55 MW

    Critical IT power in Data Hall 1

03 Pittsburgh (PIT1) · Execution timeline

615 MCMICHAEL ROAD, MCKEES ROCKS, PENNSYLVANIA

Phase 1 · Months 1–9

TARGET RFS 6-9 MONTHS

  • Cooling Redesign — underwayArchitectural redesign of cooling underway
  • Chillers & PFNPrimary upgrades required to support GB/VR
  • Existing Data HallLeveraged for rapid RFS of up to 1k GB/VR
1
2
3
4
5
6
7
8
9
Re-designUpgraded design package
started
Equipment OrderedChillers & mechanical
5 mo
GPUs OrderedOEM timelines
5 mo
Fit out worksCooling fit out works
5 mo
ConfigurationTesting & commissioning
2 mo
▼ Parallel fit out▼ Handover

6–9 RFS – Expected timelines for GPU & Cooling

03 Pittsburgh (PIT1) · Location

615 MCMICHAEL ROAD, MCKEES ROCKS, PENNSYLVANIA

Location & Connectivity

Address
615 McMichael Rd,
McKees Rocks, PA 15136
Coordinates
40.4769, -80.0786
Interstate I-79
~3 mi · ~6 min
Airport
12 mi · ~25 min drive (PIT)

03 Pittsburgh (PIT1) · Booth moment

BOOTH 3038

Next raffle or booth action

Berlin time or countdown · how to take part · terms URL

DRAFT · CONTENT TO BE CONFIRMED (STORYBOARD OPEN QUESTION 4)

04 Boden (BOD1) · Chapter opener

BOD1

Boden

SWEDEN

Hydrogränd 2, 961 43 Boden, Sweden

DRAFT · SITE FOOTAGE: VIMEO 10 S CUT TO FOLLOW (STORYBOARD OPEN QUESTION 3)

04 Boden (BOD1) · Technical specifications

HYDROGRÄND 2, 961 43 BODEN, SWEDEN

Technical Specifications

  • 22.6 MW

    Current utility supply

  • 9-12 months

    RFS from contract signature

  • Sustainability First

    Renewable energy focused

Utility Capacity
Phase 1: 22.6 MW – Phase 2: ~49 MW
IT Power (PUE 1.25)
36+ MW (18 MW per phase)
Backup Power
TBD
Rack Power – Max Q EDP
198kW
GPU Count (per 10 MW)
3,024 (total P1: 6,048, P2: 12,096)
Cooling Method
RDHx (Air) + DLC (Liquid)

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

04 Boden (BOD1) · GPU potential

HYDROGRÄND 2, 961 43 BODEN, SWEDEN

GPU Potential

Supports up to

12,096

VR GPUs

PhaseCritical IT (MW)#VR200 GPUs#GB300 GPUs#B300 GPUs
Phase 117.685,0405,7606,912
Phase 222.447,0568,0649,216
Total40.1212,09613,82416,128
  • 49 MW utility capacity at full buildout
  • 40.12 MW critical IT across 2 phases
  • Designed for large-scale AI and HPC deployment

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

04 Boden (BOD1) · Execution timeline

HYDROGRÄND 2, 961 43 BODEN, SWEDEN

Execution Timeline

14 MONTHS END-TO-END

  • Existing FacilityLeveraged for rapid retrofit
  • 12 MonthsFit-Out Ready Delivery
  • Parallel WorkstreamsOn and off-site to compress timeline
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Offsite MFG / LLIModular DC fab + long lead items
9 mo
Site PrepSite preparation
9 mo
On Site FabricationAnd critical plant installation
3 mo
E/M Comm.Elec. & Mech. Comm.
3 mo
Fit-OutFinal & Handover
2 mo
▼ Modules arrive▼ Fit-Out Ready

04 Boden (BOD1) · Location

HYDROGRÄND 2, 961 43 BODEN, SWEDEN

Location & Connectivity

Address
Hydrogränd 2, 961 43
Boden, Sweden
Coordinates
65.80429, 21.68407
Boden Station
3.8 km · ~7 min drive
Luleå Airport
41.2 km · ~30 min drive (LLA)

04 Boden (BOD1) · Follow us

Follow
Quake AI

DRAFT · CHANNEL AND URL TO BE CONFIRMED (STORYBOARD OPEN QUESTION 6)

05 Notodden (NO1) · Chapter opener

NO1

Notodden

NORWAY

Heddalsvegen 9, 3674 Notodden, Norway

DRAFT · SITE FOOTAGE: VIMEO 10 S CUT TO FOLLOW (STORYBOARD OPEN QUESTION 3)

05 Notodden (NO1) · Technical specifications

HEDDALSVEGEN 9, 3674 NOTODDEN, NORWAY

Technical Specifications

  • 20 MW

    Utility Capacity

  • 12 months

    RFS from contract signature

  • Sustainability First

    Renewable energy focused

Utility Capacity
Total 20 MW – 2x 10 MW phases
IT Power (PUE 1.25)
16 MW (8 MW per phase)
Backup Power
TBD
Rack Power – Max Q EDP
198kW
Total GPU Count
5,040 (2,520 per phase) - Vera Rubin
Cooling Method
RDHx (Air) + DLC (Liquid)

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

05 Notodden (NO1) · GPU potential

HEDDALSVEGEN 9, 3674 NOTODDEN, NORWAY

GPU Potential

Supports up to

5,040

VR GPUs

PhaseCritical IT (MW)#VR200 GPUs#GB300 GPUs#B300 GPUs
Phase 182,5202,8803,456
Phase 282,5202,8803,456
Total165,0405,7606,912
  • 20 MW utility capacity
  • 16 MW critical IT across 2 phases
  • Scalable Nordic site for AI infrastructure

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

05 Notodden (NO1) · Execution timeline

HEDDALSVEGEN 9, 3674 NOTODDEN, NORWAY

Execution Timeline

14 MONTHS END-TO-END

  • 9 MonthsOffsite module manufacturing
  • 12 MonthsFit-Out Ready Delivery
  • Parallel WorkstreamsOn and off-site to compress timeline
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Offsite MFGModular DC Fab.
9 mo
Site PrepSite preparation
9 mo
On Site FabricationModule assembly
3 mo
E/M Comm.Elec. & Mech. Comm.
3 mo
Fit-OutFinal & Handover
2 mo
▼ Modules arrive▼ Fit-Out Ready

05 Notodden (NO1) · Location

HEDDALSVEGEN 9, 3674 NOTODDEN, NORWAY

Location & Connectivity

Address
Heddalsvegen 9, 3674
Notodden, Norway
Coordinates
59.55721, 9.26350
Notodden Station
0.6 km · ~2 min drive
Oslo Airport
164 km · ~2 h 15 min (OSL)

05 Notodden (NO1) · Booth moment

BOOTH 3038

Next raffle or booth action

Berlin time or countdown · how to take part · terms URL

DRAFT · CONTENT TO BE CONFIRMED (STORYBOARD OPEN QUESTION 4)

06 Close

Quake AI

For more information: www.quake.ai