Isometric map of North America, the Atlantic and Europe drawn as purple bars, with ten Quake AI locations, each drawn as a small isometric picture of its site type. Available: Boden, Sweden; Notodden, Norway; Pittsburgh, United States. Contracted: Maysville, United States. Six further locations in the United Kingdom, the Netherlands, Portugal and Norway.BodenSwedenPittsburghUnited StatesMaysvilleUnited StatesNotoddenNorway

Global data center footprint

01 Overview · Footprint

Global Data Center Footprint

  • AvailablePittsburgh, USA5 MW
  • ContractedMaysville, USA180 MW
  • AvailableBoden, Sweden49 MW
  • AvailableNotodden, Norway20 MW

OperationalChester · London · Sines · Lefdal · Kristiansand · Amsterdam

AvailableOperationalContracted

01 Overview · Footprint table

Global Data Center Footprint

LocationRegionUtility (MW)RFSStatus
Pittsburgh, USAUSA56-9 months*Available
Maysville, USAUSA18012 months*Contracted
Boden, SwedenEurope499-12 months*Available
Notodden, NorwayEurope2012 months*Available

*Indicative timing from contract signature. Subject to customer requirements and contract.

01 Overview · GPU capacity

GPU Prospective Summary — USA

SiteCritical IT (MW)#VR200 GPUs#GB300 GPUs#B300 GPUs
Maysville, USA180 MW Utility14442,33651,84055,296
Pittsburgh, USA5 MW Utility~2.55~1,008~1,152~1,152

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

01 Overview · GPU capacity

GPU Prospective Summary — Europe

SiteCritical IT (MW)#VR200 GPUs#GB300 GPUs#B300 GPUs
Boden, SwedenP1: 22.6 MW · P2: 49 MW Utility40.1212,09613,82416,128
Notodden, Norway20 MW Utility165,0405,7606,912

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

02 Maysville (MAY1) · Chapter opener

MAY1

Maysville

USA

02 Maysville (MAY1) · Technical specifications

Technical Specifications

  • 180 MW

    Utility Capacity

  • 150+ acre

    Campus

  • 12 months

    Indicative RFS from contract signature, subject to customer requirements

Utility Capacity
Total 180 MW – 3x 60 MW phases
IT Power (PUE 1.20)
144 MW (48 MW per phase)
Number of NVL72 Racks
588 (196 per phase)
Backup Power
Diesel Generators (N+1)
Rack Power – Max Q EDP
198kW
Total GPU Count
42,336 (14,112 per phase) - Vera Rubin
Cooling Method
RDHx (Air) + DLC (Liquid)

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

02 Maysville (MAY1) · GPU potential

GPU Potential

Supports up to

42,336

VR GPUs

PhaseCritical IT (MW)#VR200 GPUs#GB300 GPUs#B300 GPUs
Phase 14814,11217,28018,432
Phase 24814,11217,28018,432
Phase 34814,11217,28018,432
Total14442,33651,84055,296
  • 180 MW Utility Capacity
  • 144 MW critical IT across 3 phases
  • Scalable campus in Maysville, Georgia

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

02 Maysville (MAY1) · Phases and lead times

3 Phases, Parallel Build-out

“Modular offsite manufacturing combined with streamlined on-site parallel workstreams allow for compressed build schedules.”

Lead Time Overview · Long Leadtime Items (average, indicative)

  • Up to 12 monthsMV Switchgear, Circuit Breakers, MV/LV Transformers, Generators
  • 9 monthsMW Relays, Cooling plant – External, UPS
  • 6 – 9 monthsCooling – Internal, LV Switchgear, Busduct

02 Maysville (MAY1) · Location

Location & Connectivity

Interstate I-85
~2 mi · ~4 min
Airport
78 mi · ~1 h 25 min drive (ATL)

02 Maysville (MAY1) · Follow us

Follow
Quake AI

03 Pittsburgh (PIT1) · Chapter opener

PIT1

Pittsburgh

USA

03 Pittsburgh (PIT1) · Technical specifications

Technical Specifications

  • 5 MW

    Utility Capacity

  • 5,686 sq ft

    Data Hall 1

  • ~2.55 MW

    Critical IT power in Data Hall 1

Utility Capacity
5 MW
Cooling
DLC & RDHx (Cooling Tower & Chillers)
UPS
Static UPS (N+1)
Backup Power
Diesel Generators (N+1)
Connectivity
Carrier Neutral – 2 meet-me-rooms
Security
Perimeter fencing, access control throughout, 24/7 security
Concurrently Maintainable
Tier III aligned – N+1 power & cooling

03 Pittsburgh (PIT1) · GPU potential

GPU Potential

Supports up to

1,008

VR GPUs

PhaseCritical IT (MW)#VR200 GPUs#GB300 GPUs#B300 GPUs
Phase 1~2.55~1,008~1,152~1,152
Total~2.55~1,008~1,152~1,152
  • 5 MW utility capacity
  • 2.55 MW critical IT

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

03 Pittsburgh (PIT1) · Execution plan

Execution Plan

6-9 months RFS

Indicative time, subject to customer requirements, to upgrade the existing data hall for GB/VR liquid cooled deployments with RDHx & DLC.

  • Up to 1K GB or VR GPUsAnticipated GPU count following updated data center design package.
  • Future ExpansionThe site benefits from additional internal space allocated for expansion capacity and power pathway with utility provider.
  • 5 MW

    Utility Capacity

  • 5,686 sq ft

    Data Hall 1

  • ~2.55 MW

    Critical IT power in Data Hall 1

03 Pittsburgh (PIT1) · Location

Location & Connectivity

Interstate I-79
~3 mi · ~6 min
Airport
12 mi · ~25 min drive (PIT)

04 Boden (BOD1) · Chapter opener

BOD1

Boden

SWEDEN

04 Boden (BOD1) · Technical specifications

Technical Specifications

  • 22.6 MW

    Current utility supply

  • 9-12 months

    Indicative RFS from contract signature, subject to customer requirements

  • Sustainability First

    Renewable energy focused

Utility Capacity
Phase 1: 22.6 MW – Phase 2: ~49 MW
IT Power (PUE 1.25)
36+ MW (18 MW per phase)
Backup Power
TBD
Rack Power – Max Q EDP
198kW
GPU Count (per 10 MW)
3,024 (total P1: 6,048, P2: 12,096)
Cooling Method
RDHx (Air) + DLC (Liquid)

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

04 Boden (BOD1) · GPU potential

GPU Potential

Supports up to

12,096

VR GPUs

PhaseCritical IT (MW)#VR200 GPUs#GB300 GPUs#B300 GPUs
Phase 117.685,0405,7606,912
Phase 222.447,0568,0649,216
Total40.1212,09613,82416,128
  • 49 MW utility capacity at full buildout
  • 40.12 MW critical IT across 2 phases
  • Designed for large-scale AI and HPC deployment

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

04 Boden (BOD1) · Location

Location & Connectivity

Boden Station
3.8 km · ~7 min drive
Luleå Airport
41.2 km · ~30 min drive (LLA)

04 Boden (BOD1) · Follow us

Follow
Quake AI

05 Notodden (NO1) · Chapter opener

NO1

Notodden

NORWAY

05 Notodden (NO1) · Technical specifications

Technical Specifications

  • 20 MW

    Utility Capacity

  • 12 months

    Indicative RFS from contract signature, subject to customer requirements

  • Sustainability First

    Renewable energy focused

Utility Capacity
Total 20 MW – 2x 10 MW phases
IT Power (PUE 1.25)
16 MW (8 MW per phase)
Backup Power
TBD
Rack Power – Max Q EDP
198kW
Total GPU Count
5,040 (2,520 per phase) - Vera Rubin
Cooling Method
RDHx (Air) + DLC (Liquid)

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

05 Notodden (NO1) · GPU potential

GPU Potential

Supports up to

5,040

VR GPUs

PhaseCritical IT (MW)#VR200 GPUs#GB300 GPUs#B300 GPUs
Phase 182,5202,8803,456
Phase 282,5202,8803,456
Total165,0405,7606,912
  • 20 MW utility capacity
  • 16 MW critical IT across 2 phases
  • Scalable Nordic site for AI infrastructure

Latest engineering principles per NVIDIA reference architecture as of June 1st, 2026. Values displayed at Max Q

05 Notodden (NO1) · Location

Location & Connectivity

Notodden Station
0.6 km · ~2 min drive
Oslo Airport
164 km · ~2 h 15 min (OSL)

06 Close

Quake AI

For more information: www.quake.ai