Zum Inhalt

AI-ready data centre in Pittsburgh

»

Discover Ardent’s cutting-edge facility in Pittsburgh, engineered for AI, HPC, and latency-sensitive workloads with up to 135+ kW per rack and energy-efficient cooling. «

Get started

12 MW

IT capacity UPS

PUE

as low as 1.15

135+ kW

per rack

Ardent_Cover_02_AS_655193337

Why choose Pittsburgh?

  • Home to globally recognized, top-tier research institutions.
  • Proximity to East Coast and Midwest markets.
  • Available clean energy sources, such as hydro and wind.
  • Close to financial hubs and growing AI ecosystems.
Talk to an expert to get started

Technical specifications

Benefits of our Pittsburgh location

Details

Capacity

12 MW IT total (2.4 MW IT available now)
Rack Density
Up to 135+ kW per rack
Cooling

RDHx + DCLC ready

Connectivity

Carrier-neutral, 2 meet-me rooms

Security

Biometric access, 24/7 surveillance

Redundancy

N+1 power and cooling

Capacity

Details

12 MW IT total (2.4 MW IT available now)

Rack Density

Details

Up to 135+ kW per rack

Cooling

Details

RDHx + DCLC ready

Connectivity

Details

Carrier-neutral, 2 meet-me rooms

Security

Details

Biometric access, 24/7 surveillance

Redundancy

Details

N+1 power and cooling

Northern_Data_Pittsburgh_VR_01_shot1

Key value

• Rapid scalability, allows fast deployment.

• AI/HPC-focused infrastructure designed for compute-heavy, high-throughput environments.

• High-density racks supported, energy-efficient site design.

Download data sheet
Northern_Data_Pittsburgh_VR_02_shot1

Who it’s built for

Whether you work for a university that’s expanding its research capabilities, a startup scaling multimodal models, or an AI infra provider launching in the U.S., our data center is ready when you are.

• Accelerate AI and HPC research with scalable, high-density colocation near Pittsburgh, solving the problem of building campus space, finding more power, and compliance challenges.

• Gain full control over your AI infrastructure with flexible, rack-ready colocation, eliminating the unpredictability of cloud costs and speeding up time to market.

• Quickly deploy in the Eastern U.S. with rack-ready colocation, avoiding build costs while gaining low-latency, AI or HPC-ready infrastructure.

Power next-generation workloads with confidence.

Power next-generation workloads with confidence.

Contact our team